Monday, April 27, 2009

Sir Robert Bond


The Ferry Sir Robert Bond arriving St. John's in March. The Bond built in 1975 at Port Weller dry-docks in Ontario is in St. John's for refit.

Car capacity - 131
Railcars - 39
passengers 235

No comments:

Another tug for dry-dock

 The Atlantic Cedar shown on dry dock getting a new paint job. The tug is 30.8 meters long, gtoss tonnage 400, and built in 2005.